Commissioning of the composting site of AWG Calw in Walddorf

On 24th May 2018 commissioning of the composting site of AWG Calw in Walddorf took place. After Simmozheim the site in Walddorf is the second composting site opf UTV AG from AWG Calw. On this Location up to 4.500 t/y of green waste will be treated.

 

Top